Marco FILTRO Flask Instrukcja Użytkownika Strona 3

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 4
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 2
HOT WATER:
LOCK FUNCTION:
Power
Time until first brew is possible
Recovery rate
1000650 - 5.6kW
Approx 23 minutes0.9 Litres/minute
1000651- 2.8kW
Approx 45 minutes
0.45 Litres/minute
Start-up Procedure:
Check that all installation procedures have been carried out.
Turn the water on at the stop valve and switch the power on at the isolator
switch or mains socket. All the LEOs on the control panel will flash momentarily.
Switch the machine on by pressing the Power Button (See Fig.1). The power
LED will glow.
The machine will automatically take in water. The Power On LED will begin to
flash until water has passed safely above the elements. Usually this takes 3
minutes but may take up to 10-15 minutes at low pressureJf10wrate.
Heating will begin, and the Power On LED will stop flashing and glow
continuously ..
When the machine is full and ready to brew the Ready To Brew LED will glow.
PlumbinQ Installation Procedure:
Mains water pressure required (limits): 5-50psi (35-345kPa)
A minimum continuous flow rate of 1.5Litres per minute is required for correct
operation. Interruption in water flow rate can result in a lower brew volume.
Fit a Stop Valve on a cold water line and attach a 3/4" BSP male fitting, (e.g.
3/4" x 1/2" or washing machine type stop valve) .
Connect straight tailpiece of the inlet hose to the stop valve fitting. Make sure
that the pre-attached sealing washer is fitted.
Turn on the water to flush any impurities, dust etc from the inlet hose and water
pipe. Allow severallitres through.
Connect right-angled tailpiece of the hose to the inlet valve of the boiler (again
3/4" BSP). Make sure the sealing washer is fitted here also.
Turn on water and check for leaks.
Electrical Installation Procedure:
1000651- 2.8kW/230V ac - a moulded 13A plug is factory fitted. A suitable 13A
supply is all that is required.
1000650- 5.6kW/230V ac - This unit must be connected to a suitable 30A single
phase power supply. This should be done by a qualified electrician.
WATER INLET
VALVE
FiQ.2
310
570
To disable the Lock Function - hold the Lock Button for 6 seconds again.
510
The Filtro Shuttle has a button lock function to prevent untrained personnel
operating the machine, or accidental misuse. To enable the lock function the
Lock Button (see fig.1) is pressed and held for 6 seconds, the red Lock Function
LED next to the button will illuminate. The control panel is now 'locked'. No
buttons are operational when the lock function is enabled. The machine will
operate as normal, Le. if the machine is brewing, it will continue to brew. Once
completed another brew cannot be selected until the lock is disabled. The
Ready to Brew LED may still be on, but no brew will be able to be selected.
When the machine is full, water is available from the tap on the side for cups of
tea etc. This is available at a rate of 0.45 litres per minute at 2.8kW and
0.9Litres per minute at 5.6kW. The water flow rate is low since priority is given
to the brewing function of the machine.
After brewing, remove the filter paper with the spent grinds when the basket can
freely move and dripping has stopped. A brew should only be selected
whenever the green Ready to Brew LED illuminated in order to produce the
highest quality of coffee possible. The Ready to Brew LED turns on when there
is enough water at the correct brewing temperature.
Note: The basket will lock into position during a brew time. Time should be
allowed for all the coffee to drain from the filter bowl before removing.
300
I HOT WATER TAP I
I CONTROL I
PANEL
I BREW BASKET I
Instruction Booklet Filtro Shuttle 29-03-07.doc
Page 6 of 8
Instruction Booklet Filtro Shuttle 29-03-07.doc
Page 3 of 8
Przeglądanie stron 2
1 2 3 4

Komentarze do niniejszej Instrukcji

Brak uwag